Back to top

Jan De Nul Group - Race Bank (UK)

Published by Jan DE NUL Group on 5 January 2018

Jan De Nul Group - Race Bank (UK)

The installation and burial of the export cables for Ørsted’s Race Bank Wind Farm in the United Kingdom. Jan De Nul successfully installed two export cables of 70 km across England’s most important natural habitats and linked the two Offshore Substations with an interconnector of 6 km.

References

[1]

Jan De Nul Group. Video - Jan De Nul Group - Race Bank (UK). URL: https://www.youtube.com/watch?v=c8Gjq8RGudw. [Date Accessed: 05/01/2018].