Back to top
Reported by Vestas on 19 October 2018

Vestas wins 294 MW order in South African auction and introduces the first V136-4.2 MW turbines in Africa

(Courtesy of Vestas Wind Systems A/S)

Vestas’ global partner Enel Green Power has awarded Vestas a 294 MW order of V136-4.2 MW turbines, delivered in 4.2 MW Power Optimised Mode, for two projects in South Africa. The projects consist of 147 MW each and debut the V136-4.2 MW in the South African market and will feature the largest Vestas rotor diameters in Africa to date.

The two wind parks, Karusa and Soetwater, are both located at the South African Western Cape and will feature 35 turbines each with a hub height of 82 meters. Leveraging the 4.2 MW Power Optimised Mode for the sites’ medium-speed wind conditions, the V136-4.2 MW will boost performance and increase annual energy production. To lower turbine downtime and levelised cost of energy, the project will also include a VestasOnline® Business SCADA solution.

As part of delivering the projects, Vestas will create local wind energy jobs, fulfilling the local requirements for local content, skills development and socio-economic development initiatives.

“We are very dedicated to making a difference in South Africa and contribute to enhancing socio-economic growth and sustainable educational development. We are doing so by procuring locally produced towers, contracting local transport companies and supporting community school programs through our own initiative, the Vestas Empowerment Trust,” says Nils de Baar, President of Vestas Northern & Central Europe.

Long-term customer Enel Green Power is a global developer and manager of activities for the generation of energy from renewable sources, aiming at supporting the safeguarding of the environment throughout the various phases of development, construction and management of their plants, reducing impacts and developing the principle of the circular economy.

The contract includes supply, installation and commissioning of the wind turbines, as well as a 5-year Active Output Management 5000 (AOM 5000) service agreement. Turbine delivery and installation is planned for the second half of 2020.

References

[1]

Vestas Wind Systems A/S. Press release - Vestas wins 294 MW order in South African auction and introduces the first V136-4.2 MW turbines in Africa. URL: https://www.vestas.com/en/media/company-news?n=1826931. [Date Accessed: 19/10/2018].

Order

21 Dec | Senvion signs 340 MW conditional wind turbine contracts with Mainstream Renewable Power in Chile

  • Repeat order from Mainstream comprises largest order for newly launched 4.2M platform
  • Represents one of biggest ever Chilean wind turbine contracts

Order

19 Dec | Casa dos Ventos places order for 151 MW of V150-4.2 MW turbines in Brazil

To offer its customers the most efficient and competitive wind energy solutions and to underline its commitment to the expansion of Brazil’s wind market, Vestas earlier this year announced it will produce its leading onshore wind turbine, the V150-4.2 MW, in Brazil.

Order

18 Dec | Nordex obtains follow-up order for 83 MW from Argentina

The Nordex Group is ramping up its presence further in the growth market of Argentina with a follow-up order from its customer AES Generación S.A. The "Vientos Neuquinos" wind farm comprises 24 AW132/3465 turbines and is to be built in the province of Neuquén in the south-west of Argentina.

Order

15 Nov | YPF Luz and GE Renewable Energy to construct Los Teros Wind Farm in Azul, Argentina

  • An investment of US$ 144 million is expected. 
  • The energy produced is equivalent to the consumption of 160,000 homes and may reduce about 5.5 million tons of CO2 in 20 years.

Order

19 Dec | Casa dos Ventos places order for 151 MW of V150-4.2 MW turbines in Brazil

To offer its customers the most efficient and competitive wind energy solutions and to underline its commitment to the expansion of Brazil’s wind market, Vestas earlier this year announced it will produce its leading onshore wind turbine, the V150-4.2 MW, in Brazil.

Business & Finance

25 Oct | Vestas to produce the V150-4.2 MW wind turbine in the state of Ceará in Brazil

Vestas has signed a framework agreement with the intention to produce V150-4.2 MW nacelles in the Brazilian state of Ceará. The framework agreement was signed by the Governor of Ceará, Camilo Sobreira de Santana, and Rogério S.

Order

27 Sep | Vestas extends market leadership with a 225 MW order for four projects in Argentina

Vestas has received a 225 MW order from Central Puerto S.A., one of the leading energy groups in Argentina, for four different wind parks.

Order

27 Sep | Vestas to introduce the V150-4.2 MW in South America with 101 MW order in Brazil

Vestas has received a 101 MW order to supply and install 24 V150-4.2 MW wind turbines for a wind park in Serra do Mel, State of Rio Grande do Norte.