Back to top
Reported by Vestas on 30 November 2017

Vestas to repower two wind parks in Italy, extending its leadership in the market

V117-3.0 MW, Rødby Fjord, Denmark (Courtesy of Vestas Wind Systems A/S)

Vestas has received a combined 53 MW repowering order for the Castiglione Messer Marino and Schiavi d’Abruzzo wind parks, underlining repowering’s growing significance in wind energy’s continued growth. Vestas will replace 59 units of third party 600 kW turbines with 16 V112-3.3 MW turbines and hereby increase the wind parks’ nominal power by 50 percent whilst reducing the number of wind turbines by more than 70 percent. 

The orders are placed by E2i Energie Speciali Srl, a company owned by F2i (Fondi italiani per le infrastrutture) and Edison/EDF group, and are the only projects that will be constructed in the Abruzzo region in central Italy derived from Italy’s 2016 and latest auction.

Alberto Musso, Chief Operating Office of E2i Energie Speciali, addedReplacing old machines with fewer, taller and especially more modern units with increased reliability and higher electricity production is one of the main targets of our company. E2i has an historical business relationship with Vestas and this contract to replace wind turbines in two wind farms in the Abruzzo region further strengthens our partnership.”

Having installed more than 40 percent of Italy’s total wind capacity, today’s order underlines Vestas’ leading position in Italy. The projects take Vestas’ announced orders in Italy in 2017 to 169 MW, while order intake from Italian auctions over the last five years surpasses 840 MW.

Marco Graziano, President of Vestas Mediterranean, said “These projects show we are the preferred choice within repowering and underline how our unique technological solutions and auction-related offerings enable our customers’ success in auctions. Vestas’ repowering capabilities will further strengthen our position in Italy as the country’s growing number of older wind turbines will be replaced with modern wind technology that reduces the cost of energy and increases output.”

Turbine delivery is expected for the third quarter of 2018, whilst commissioning is planned for the fourth quarter of 2018. For the two wind parks, the order includes supply and installation of respectively 12 and four Vestas turbines.

References

[1]

Vestas Wind Systems A/S. Press release - Vestas to repower two wind parks in Italy, extending its leadership in the market. URL: https://www.vestas.com/en/media/company-news?n=1651686. [Date Accessed: 01/10/2018].

[2]

Vestas Wind Systems A/S. Images. https://www.vestas.com/en/media/images. [Date Accessed: 21/02/2017].

Order

10 Jan | The Nordex Group to build two more wind farms for Vattenfall in the Netherlands

13 large turbines planned for Dutch projects totalling 49 MW

Order

09 Jan | Senvion confirms notice to proceed for 41 MW in Spain

First phase of Spanish agreement signed with Alfanar Energy Hamburg/Madrid

Order

08 Jan | Nordex obtains 300 MW order for major project in India

In December 2018, the Nordex Group has received a 300 MW turnkey order from Sprng Energy Private Limited. The project "Mulanur" is located in the state of Tamilnadu, near to the city of Coimbatore.

Order

08 Jan | Senvion converts 300 MW contract in India into firm order

Senvion confirms the firm order conversion of the 300 MW contract with alfanar India. The signing of the order for the Bhuj project was announced at the beginning of December 2018.

07 Feb | Vestas Annual report 2018

Company announcement No. 03/2019

25 Jan | New 99 MW order reinforces Vestas’ leading position in Russia’s growing wind energy industry

Vestas has secured an order for a 99 MW wind project from a joint venture between Rusnano and Fortum. Located in the Rostov region, the project will comprise 26 V126-3.45 MW turbines delivered in 3.8 MW Power Optimised Mode.

24 Jan | Vestas introduces EnVentus – Vestas’ innovative modular platform, starting with two new industry-leading wind turbine variants

Vestas has been at the frontier of wind energy for 40 years, introducing market-leading wind energy solutions that have driven the down cost of energy and taken wind energy from niche to mainstream.

11 Jan | Vestas receives 101 MW order for V120-2.2 MW turbines featuring the tallest towers in China

Leveraging its high tower solution, Vestas has secured a 101 MW order in China for 46 V120-2.2 MW turbines that will all feature the country’s tallest towers with a hub height of 152m.