Back to top
Reported by Tokyo Electric Power Company Holdings (TEPCO) on 6 December 2018

TEPCO’s First Commercial Offshore Wind Power Facility to Launch on January 1, 2019

Tokyo Electric Power Company Holdings Inc. (TEPCO) announced today that the company’s first commercial offshore wind power facility will launch on January 1, 2019.

(Courtesy of Tokyo Electric Power Company Holdings, Inc.)

Since 2013, TEPCO has been conducting Japan’s first demonstration test of offshore wind power facility (rated output: 2,400 kW; bottom-fixed foundation turbine), which is located south of Choshi, Chiba Prefecture.

During the demonstration, TEPCO continuously monitored test data with the aim of confirming technologies necessary to introduce and expand offshore wind power facilities. The demonstration provided TEPCO with valuable experience in operating and maintaining the facility in harsh weather and marine conditions, as well as ensuring equipment safety and resistance to damage from saltwater. As a result, the demonstration test proved conclusively that TEPCO’s facility is safe and can be operated at a high capacity factor.

TEPCO will now move forward with offshore wind power projects, both in Japan and abroad, in addition to overseas hydroelectric power projects, aiming to develop renewable energy sources as primary sources of power. TEPCO’s eventual goal for domestic offshore wind power is output of between two and three GW of power.

With this goal in mind, TEPCO announced on November 1 that it had begun conducting a seabed survey off the coast of Choshi to examine the feasibility of developing an offshore wind farm in that area.

Going forward, TEPCO will expand its use of renewable energy sources to support the company’s provision of stable electricity supply. By engaging in businesses with minimized environmental impact, TEPCO expects to help counteract the effects of global warming while continuing to contribute to Japan’s energy and environment policies.

Attachment

References

[1]

Tokyo Electric Power Company Holdings, Inc. Press release - TEPCO’s First Commercial Offshore Wind Power Facility to Launch on January 1, 2019. URL: https://www7.tepco.co.jp/newsroom/press/archives/2018/tepcos-first-commercial-of.... [Date Accessed: 06/12/2018].

Project Development & Execution

14 Dec | Fortum-Rusnano wind investment fund to start implementation of 100-MW project in Russia

The Fortum-Rusnano wind investment fund has taken the investment decision for a 100-megawatt (MW) wind power project in Russia. It is the third project of the total 1,823 MW awarded to the fund in the Russian wind auction in 2017 and 2018.

Project Development & Execution

12 Dec | Enel Green Power starts operation of HillTopper, its first wind farm in the U.S. state of Illinois

  • The 185 MW wind farm will sell its power to Bloomberg LP, General Motors and Constellation, an Exelon company
  • Enel invested approximately 325 million US dollars in the construction of the wind farm, which will generate around 570 GWh per year
  • HillTopper brings the total renewable capacity connected by Enel Green Power to grids around the world from January 2018 to date to approximately 1,981 MW

Project Development & Execution

11 Dec | Repowering: EDF Renewables commissions a fully renewed wind farm in Germany

EDF Renewables in Germany is announcing the repowering of the Eckolstädt wind farm, the first in a series to come. “Repowering” or renewing means the refurbishment of a facility that has reached the end of its life cycle.

Project Development & Execution

11 Dec | Completion of 228MW Stronelairg Onshore Wind Farm

SSE has completed the construction and commissioning of the 66 turbine/228MW (megawatt) Stronelairg wind farm, near Fort Augustus.  With a total investment of around £350m, Stronelairg is expected to be SSE’s final wind farm to be accredited under the Renewables Obligation.