Back to top
Reported by ONYX InSight on 2 October 2018

ONYX InSight keeps tabs on 8.3MW turbines at Blyth offshore demonstrator wind farm

Predictive maintenance provider signs 3-year contract with EDF Renewables at Blyth Offshore Demonstrator wind farm to monitor their largest operational wind turbines.

(Courtesy of pixabay.com)

ONYX InSight, a predictive analytics provider that gives asset owners clarity and control over their operations, has signed a contract with EDF Renewables to provide predictive maintenance services at the Blyth Offshore Demonstrator Project (Blyth). The contract will see ONYX InSight monitor the project’s 8.3MW MHI Vestas V164 wind turbines – some of the largest installed turbines in the world – throughout the first three years of their operation.

As the offshore wind sector aims to boost generation capacity and efficiency to bring down the levelised cost of energy, turbine technology is increasing rapidly in scale. The V164 8.3MW turbine is set for widespread deployment in upcoming rounds of offshore wind development, while even larger 10MW+ turbines are on the horizon.

Fraser Morris, Business Development Manager at ONYX InSight, said: “Turbines of this size will soon become the standard in offshore wind, which means operators need to have a good understanding of how they perform. With energy production on this scale, the stakes are inevitably raised, and the business case for investing in robust and accurate predictive analytics is clear.”

This increase in scale brings with it increased complexity. With the contribution of each individual turbine to overall generation growing, any downtime has a greater proportional impact on production and revenues. This means that it is crucial to stay on top of performance, and effective predictive analytics is necessary to mitigate the risk of costly equipment failure and other interruptions.

There are, in turn, challenges involved in monitoring such large machines. With a high number and great variety of sensors on the MHI Vestas V164, the sheer volume of SCADA and condition data produced places unprecedented demands on monitoring systems.

“The ability of a predictive maintenance platform to handle large quantities of data – from a diverse range of sensors – will be a key differentiator when it comes to mitigating the risk of downtime for these 8MW+ machines over the long term,” commented Fraser Morris

At Blyth, ONYX InSight is using Fleet Monitor – a technology-agnostic predictive analytics platform that pulls data from all of these sensors into one place. Fleet Monitor will enable effective monitoring and analysis of all sensor data, to keep tabs on turbine condition and performance for EDF Renewables. In turn, ONYX InSight’s monitoring team will detect, diagnose and mitigate failures before they occur.

ONYX InSight is a joint venture, combining Romax Technology’s 30 years of expertise in software, services and data analytics for gearbox, bearings and rotating machinery with Castrol’s knowledge of wind turbine lubrication.

References

[1]

InSight Analytics Limited. Press release - ONYX InSight keeps tabs on 8.3MW turbines at Blyth offshore demonstrator wind farm. URL: https://onyxinsight.com/2018/10/02/onyx-insight-keeps-tabs-on-8-3mw-turbines-at-.... [Date Accessed: 02/10/2018].

Operation & Maintenance

08 Jan | Full Access to CMS Data Prevented by Majority of Top Hardware Providers

New whitepaper from leading predictive analytics partner ONYX InSight highlights restrictions on turbine performance data access and empowers owner operators to hold suppliers to account

Operation & Maintenance

07 Jan | CEZ Relies for Wind Farm Management on wpd windmanager

New wind farm for the wpd windmanager GmbH & Co. KG: As of January 1, 2019, the CEZ Group assigns the operational management for the wind farm Fohren-Linden to the Bremen-based company.

Operation & Maintenance

20 Dec | innogy signs long-term service contract with Senvion for its 295 MW offshore wind park Nordsee Ost

Senvion has been awarded a four-year service contract of innogy SE for the Nordsee Ost offshore wind farm following a competitive tender process. Senvion has been responsible for the service of the in total 48 wind turbines since their installation in 2014.

Operation & Maintenance

08 Jan | Full Access to CMS Data Prevented by Majority of Top Hardware Providers

New whitepaper from leading predictive analytics partner ONYX InSight highlights restrictions on turbine performance data access and empowers owner operators to hold suppliers to account

Operation & Maintenance

27 Nov | Pattern recognition for ONYX InSight’s predictive maintenance services on 950MW of wind assets

Leading predictive analytics provider hooks up 950MW to its hardware, software and analytics platform for Pattern Energy, expanding 4-year long relationship between the two companies in North America.

Operation & Maintenance

08 May | ONYX InSight Rolls Out Advanced Predictive Analytics for BP Across 1.2GW US Wind Fleet

85 turbines across 10 wind farms incorporated into ONYX InSight’s fleetMONITORTM platform as part of a data-driven, engineering-based approach to predictive maintenance