Back to top
Reported by Nordex on 8 August 2019

The Nordex Group receives new orders in Spain for 67 MW

(Courtesy of Nordex SE)

The Nordex Group has notched up another success in Spain: the Alfanar Group has commissioned the manufacturer to supply and install 22 turbines for two wind farms with a total of 67.2 MW. Both orders also include full service for a period of 20 years.

The two wind farms are to be built in the province of Albacete in Castilla-La Mancha, approx. 300 kilometres to the south-east of Madrid. The "Barrax" wind farm will include ten AW140/3000 and three AW132/3300 turbines. For the "Chinchilla" wind farm, Nordex will provide eight AW140/3000 machines and one AW132/3300 turbine. The turbines will be installed on concrete towers with a hub height of 120 metres, with delivery scheduled for the second half of 2020.

"We are delighted that the Alfanar Group has chosen our technology," says Patxi Landa, CSO of the Nordex Group. "Alfanar is very experienced in the wind industry and we are proud of the cooperation."

References

[1]

Nordex SE. Press release - The Nordex Group receives new orders in Spain for 67 MW. URL: http://www.nordex-online.com/index.php?id=53&L=2&tx_ttnews%5Btt_news%5D=3126&tx_.... [Date Accessed: 08/08/2019].

14 Aug | Nordex launches 163 metre rotor for the Delta4000 5.X

• Maximum efficiency thanks to more than 20,000m² swept area

05 Aug | Nordex Group receives order for 269 MW from USA

• Another major order for turbines from the Delta4000 platform

03 Jul | Nordex Group receives orders of 2.0 gigawatts in the second quarter of 2019

The Nordex Group announced that it has continued the strong order intake performance seen in recent quarters with buoyant demand for its wind turbines in the second quarter of 2019 as well.