Back to top

Videos

205 entries found.
# Date published Title Stakeholder Topic
26 25 October 2018 World’s First Autonomous Offshore Robot – ANYmal
27 23 October 2018 Upgrades on Brave Tern and Bold Tern Fred. Olsen Windcarrier
28 22 October 2018 CFD toolkit simulating the response of offshore floating structures with mooring cables HR Wallingford
29 22 October 2018 Silence in the Wadden Sea Ørsted
30 22 October 2018 TWD - Hammock Seafastening Tool Temporary Works Design (TWD)
31 19 October 2018 Assessing Environmental Impacts of the Block Island Wind Farm Bureau of Ocean Energy Management (BOEM)
32 15 October 2018 Drone Inspection of Offshore Wind Turbines - Deepwater Wind - Block Island ULC Robotics
33 15 October 2018 BorWin gamma topside being installed in the German North Sea Petrofac
34 10 October 2018 Introducing ORE Catapult's Dynamic Cable Test Rig ORE Catapult
35 10 October 2018 North East partnership builds world-first cable test rig ORE Catapult
36 9 October 2018 NB57 Wind of Change Launching Cemre Shipyard
37 8 October 2018 Collaboration on Borkum Riffgrund 2 MHI Vestas Offshore Wind
38 8 October 2018 Jan De Nul Group - Borkum Riffgrund II (Germany) Jan DE NUL Group
39 23 September 2018 Experience wind power offshore in 360° Siemens Gamesa Renewable Energy Technology
40 20 September 2018 2018 Rotterdam Offshore Wind Coalition Sif
41 17 September 2018 DeepOcean officially launches Offshore Base at Port of Blyth DeepOcean Group
42 12 September 2018 Elisa Technology by Esteyco ESTEYCO
43 11 September 2018 Damen Fast Crew Supplier 2710 Damen Shipyards Group
44 6 September 2018 Fred. Olsen Windcarrier working on Borkum Riffgrund 2 Fred. Olsen Windcarrier
45 5 September 2018 Hexicon´s wind farm area efficiency Hexicon
46 5 September 2018 Walney Extension – the world’s largest offshore wind farm in operation Ørsted
47 20 August 2018 First Transition Pieces depart Wilton Engineering for Hornsea Project One Wilton Engineering Services
48 14 August 2018 Timelapse from Borkum Riffgrund II - Bold Tern Fred. Olsen Windcarrier
49 11 August 2018 Uljanik 520 APOLLO - Pula 10.8.2018 DEME Group
50 9 August 2018 Demonstration Project of Next-Generation Floating Offshore Wind Turbine New Energy and Industrial Technology Development Organization (NEDO)

Pages